Abstract

Following extensive testing and evaluation in a pilot plant, a large commercial pre-production noble metals refinery utilising a recently developed solvent extraction process has been constructed and is currently undergoing commissioning trials. Built with due regard to the needs of the users of the platinum metals, to the health and safety of the operators and to the protection of the environment, the capacity of the new refinery indicates confidence in the long term demand for the platinum metals.

Loading

Article metrics loading...

/content/journals/10.1595/003214084X28126
1984-01-01
2024-11-02
Loading full text...

Full text loading...

/deliver/fulltext/pmr/28/1/pmr0028-0002.html?itemId=/content/journals/10.1595/003214084X28126&mimeType=html&fmt=ahah

References

  1. A. F. S. Gouldsmith, B. Wilson, 1Platinum Metals Rev., 1963, 7, (4), 136 [Google Scholar]
  2. L. B. Hunt, F. M. Lever, 2Platinum Metals Rev., 1969, 13, (4), 126 [Google Scholar]
  3. M. J Cleare, P Charlesworth, D. J Bryson, 3J. Chem. Technol. Biotechnol., 1979, 29, (4), 210 [Google Scholar]
  4. L. R. P Reavill, P Charlesworth, 4 Liege, Belgium, 1980, vol. 3, Paper 8093
  5. M. J Cleare, R. A. Grant, P Charlesworth, 5 London 1981, 3441
  6. P Charlesworth, 6Platinum Metals Rev., 1981, 25, (3), 106 [Google Scholar]
/content/journals/10.1595/003214084X28126
Loading
/content/journals/10.1595/003214084X28126
Loading

Data & Media loading...

  • Article Type: Research Article
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test